TT CHEETAH SERIES
ELECTRON BEAM POWER SUPPLY
INSTRUCTION MANUAL
Copyright © TELEMARK, 2018 All rights reserved
March 2018
telemark.com
Brand and product names are trademarks or
registered trademarks of their respective companies.
Current version of this manual can be found at
https://telemark.com/e-beam-power-supplies/tetrode-tube/
Question and Answer IconNeed help?

Do you have a question about the Telemark TT CHEETAH Series and is the answer not in the manual?

Summary

Warranty

Safety Warnings

Unpacking

Specifications

Installation

System Grounding Practice

Critical grounding procedures for safety and performance, avoiding improper connections.

Connecting to Building Steel

Best practices for E-beam grounding to building steel, including strap sizing.

High Voltage Safety

Essential safety measures when working with or near high voltage components.

Ground Connections

Details on connecting the six required ground leads to the E-beam chamber.

Interconnection Procedure

Comprehensive instructions for wiring the HVPS, controller, and related components.

Operation

Controller Functions and Switches

Explanation of controller front panel controls, including buttons, switches, and displays.

Initial Start-Up Procedure

Step-by-step guide for the initial power-up, testing, and configuration of the supply.

Preventive Maintenance

Multi-Source Operation

Telemark TT CHEETAH Series Specifications

General IconGeneral