EasyManuals Logo

Terex RL4000D2 Series User Manual

Terex RL4000D2 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
November 2006
P
a
r
t
N
o
.
8
3
3
0
0
5
R
e
v
A
R
L
4
0
0
0
L
i
g
h
t
T
o
w
e
r
1
7
OPERATING INSTRUCTIONS
LIGHT TOWER AUXILIA
RY PO
WER:
1.
One 20 amp, 120 V
AC GFI receptacle
and one 30 amp, 240 V
AC receptacle are prov
ided
for auxiliary power.
2.
T
otal auxiliary power cannot
exceed main circuit breaker rat
ing. Each lamp operating
consumes 9.5 amps of 120
volt power.
3.
Before plugging in
auxiliary power
cords, feed t
hem up through
the trailer fr
ame and
attach to receptacles. Close the cabinet doors to
protect control panel and other
components from weather.
SHUTDOWN PROCEDURES:
1.
Place all lig
ht switc
hes into the
ir OFF” posi
tion.
2.
Allow the engine to run for 1 t
o 5 minutes under no load, then
turn the unit “OFF”.
Ne
ver shut
the unit
down
while un
der load. The
AC gene
rator
may become damaged.
Af
ter b
ein
g sh
ut
do
wn
, the li
gh
ts
mu
st
be all
ow
ed to
co
ol
down before trying to r
estart the
light
s. T
his coo
l down
period c
an be betwee
n 10-
25 minutes, depe
nding
on t
he
ambient temperature.
LOWERING THE TOWER:
1.
Using the upper
telescoping winch,
telescope the t
ower down to
its fully ret
racted
position.
The
boom sho
uld lower smoot
hly and eve
nly to it
s lowest
posit
ion. If it does not, contact a qua
lifi
ed me
chanic.
Insure the
coil co
rd does not become e
ntangled with the
lower tower se
ctio
ns.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex RL4000D2 Series and is the answer not in the manual?

Terex RL4000D2 Series Specifications

General IconGeneral
BrandTerex
ModelRL4000D2 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals