These instructions deal with the assembly and routing of cable for the Terex RL4000
making this a smooth assembly.
referred to here as the tower (1), the
the upper (3) boom tubes (see Figure 1).
Feed cable up through the hole
on the bottom of the second stage boom
tube with the crimped end at the bottom and lay the cable along the length of
Run the cable over the upper
pulley on the tower boom tube
tower boom tube (See Figure 3).
attach cable to the clevis pin on the second stage boom