TechPub_2614345_0105 - IM_CAP30_0103fro.fm
CAP 30/Flex
662950-0100
ScrewCap
Installation Manual
IM
Doc. No. IM-2852922-0103
WARNING
Read and follow all safety precaution instructions throughout this
manual and on safety signs attached to this equipment.
Failure to follow all safety precaution instructions could result in death or
serious injury.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Tetra Pak CAP 30/Flex ScrewCap and is the answer not in the manual?

Summary

Introduction

Abbreviations and Terminology

Glossary of terms and abbreviations used in the manual.

Manual Information

Details on manual usage, scope, and integrity.

Machine Introduction

Overview of the equipment's purpose, manufacturer, and support.

Identification

Information on CE classification and machine plate details.

Safety Precautions

Safety Messages Description

Explanation of safety alert symbols and signal words used.

Personnel Requirements

Defines roles and qualifications for personnel working with the equipment.

Safety Signs

Identifies safety signs, their meanings, and locations on the equipment.

Protective Devices

Details on emergency stops, safeguards, warning lamps, and audible alarms.

Hazardous Substances

Information on handling chemicals and personal protective equipment.

Technical Data and Drawings

Installation Drawings

Diagrams showing machine dimensions and connection points for installation.

Mass (Weight)

Details on the weight and lifting points of the machine components.

Utility Connection Data

Specifications for electrical power, compressed air, and water supply.

Noise

Measurements for sound pressure and sound power levels of the machine.

Preparation

Requirements

Outlines general and space requirements for machine installation.

Special Tools, Auxiliary Equipment and Information

Lists necessary tools, equipment, and information for installation.

Moving and Unpacking the Equipment

Crate Handling

Provides data and guidelines for handling the equipment crate.

Lifting and Unloading

Instructions for safe lifting and unloading of the equipment crate.

Unpacking Sequence

Step-by-step procedure for safely unpacking the equipment.

Positioning, Assembly and Connections

Positioning

Guidance on moving the machine to its final position and respecting distances.

Level the Equipment

Procedures for installing feet and leveling the machine body.

Assembly

Detailed instructions for assembling various machine components.

Connections

Steps for making electrical, compressed air, and water connections.

Final Installation Check

Installation and Connection Checks

Checklist for verifying proper installation and connections.

Lubricant Level Checks

Procedure for checking lubricant levels in the machine.

Safety Checks

Checks to ensure safety features and signs are correctly implemented.

Preparation for Commissioning

Presence and Correctness Checks

Verifies the presence and correctness of all components and documentation.

Utility Value Checks

Confirms that utility values are set correctly according to specifications.

Function Checks

Procedures to verify the correct functioning of machine components and systems.

Disassembly and Removal

Disconnect Utilities

Steps for safely disconnecting compressed air, electrical, and water supplies.

Disassemble Machine

Instructions for safely disassembling the machine.

Disposal

Guidelines for the environmentally sound disposal of machine components.

Tetra Pak CAP 30/Flex ScrewCap Specifications

General IconGeneral
ModelCAP 30/Flex
Cap TypeScrew caps
CompatibilityTetra Pak packaging lines
MaterialStainless steel
CapacityUp to 30, 000 packages per hour