EasyManua.ls Logo

Teuco Evolution E02 A User Manual

Teuco Evolution E02 A
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2360
E02 A
2360
E02 C
HR
Uputstva za montaÏu
TR
Montaj Talimatları
PL
Instrukcje montażu
GR
√‰ËÁ›Â˜ ÂÁηٿÛÙ·Û˘
RU
Инструкция по монтажу
P
Instruções para a Montagem
NL
Montage-instructies
E
Instrucciones de montaje
D
Montage-anweisungen
F
Instructions pour le montage
GB
Assembly instructions
I
Istruzioni di montaggio
Question and Answer IconNeed help?

Do you have a question about the Teuco Evolution E02 A and is the answer not in the manual?

Teuco Evolution E02 A Specifications

General IconGeneral
BrandTeuco
ModelEvolution E02 A
CategoryShower Cabins
LanguageEnglish

Summary

Tools and Accessories

Tools for Assembly

Lists various tools required for the proper assembly of the product.

Accessory Bags Contents

Details the contents of accessory bags provided for installation.

Product Specifications

Weights and Dimensions

Provides net weight, shipping weight, and shipping volume for the models.

Hydraulic and Electrical Data

Outlines hydraulic flow rates, pressure ranges, and electrical power ratings.

Installation Guide

Bracket Mounting (Steps 1A-1D)

Attaching the bracket to the wall, marking, drilling, and securing it.

Control Panel Installation (Steps 2A-2B)

Installing and securing the equipped control panel for sauna models.

Shower Tray & Drain Setup (Steps 3A-3C)

Installing the drain valve, positioning the tray, and connecting the drain pipe.

Side Panel Preparation (Steps 4A-4B)

Disassembling clips and attaching side panels to the shower tray.

Upper Guide Rail Installation (Steps 5A-5C)

Preparing, installing, and attaching the upper guide rail.

Main Body Assembly (Steps 6-7)

Mounting the rear panel and installing the door onto the main structure.

Seal Fitting (Step 8A)

Fitting seals along the upper guide rail and the right side of the door.

Seal Fitting (Step 8B)

Fitting seals along the upper guide rail and the rear panel.

Panel and Door Adjustments (Steps 9-10)

Adjusting rear panel and door alignment using friction units.

Dome Installation (Step 11)

Installing the dome on the upper guide rail, ensuring pipes are behind.

Hydraulic Connections (E02 A)

Connecting hot water, cold water, and shower head for E02 A model.

Hydraulic Connections (E02 C)

Connecting hydraulic lines for E02 C model.

Electrical Connections (E02 C)

Connecting electrical lines for E02 C model.

Shelf & Rear Panel Securing (Steps 13-14)

Installing the shelf and securing the rear panel to the structure.

Side Panel Preparation & Attachment (Steps 15A-15B)

Preparing and attaching side panels to the tray and wall brackets.

Final Side Panel Securing (Step 15C)

Tightening screws for side panels.

Silicone Sealing (Step 16)

Applying neutral silicone between the tray and floor to prevent leaks.

Related product manuals