EasyManua.ls Logo

The Garden Gym Dip station - User Manual

Default Icon
3 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
General guidance
These instructions are provided as a guide to help you
install your equipment. Depending on the type of ground
conditions it may be necessary to modify the installation.
If you are unsure, please consult a qualified professional or
contact the Garden Gym Team. The installation should be
carried out by 2 people. Before digging you must ensure
that there is no risk of encountering services such as
drains or electricity.
The Garden Gym does not accept any liability in relation
to the installation and subsequent use of the gym
relating to incorrect or improper installation.
You will need
Spade / hole diggers / safety gloves / step ladder / tape /
measure / level / 2 x 19mm socket drivers / hammer
Post mix
Between 1 and 2 bags per post, depending on
the size of your holes and ground conditions
Dip station
Installation guide
NB- Before you start!
Ensure that the first pull up bar is solid. You will connect the
monkey bar to the original pull up bar which will can create
movement in the foundations. We recommend that you let the
pull up bar concrete harden before starting to add the monkey
bar. Depending on the mix you used this would be between 2-4
hours.
Question and Answer IconNeed help?

Do you have a question about the The Garden Gym Dip station and is the answer not in the manual?

Summary

Before You Start

General Guidance

Instructions for installation, emphasizing ground conditions and professional consultation. Covers liability.

Installation Steps

Layout the bars

Positioning the dip bars and cross bars to mark out hole locations for post installation.

Digging the holes

Digging post holes to a minimum depth of 600mm, allowing space for alignment and adjustment.

Assemble the first bar

Installing posts and bars, starting with the pull-up unit connection before concrete.

Insert the rest of the posts and bars

Inserting remaining posts and bars, loosely bolting them to allow for leveling before final tightening.

Concrete in place

Adding concrete once alignment is confirmed, backfilling holes, and checking fixings.

Important Considerations

Foundations

Ensuring post stability with a minimum depth of 600mm and proper drainage at the base.

Maintenance

Checking bolts and fixings monthly for tightness due to timber drying.

Train Safe!

Safety guidelines including medical consultation, proper usage, warm-ups, and supervision.

Overview

This document provides a comprehensive guide for the installation, use, and maintenance of "The Garden Gym" dip station. It emphasizes safety, proper installation techniques, and ongoing care to ensure the longevity and safe operation of the equipment.

Function Description

The Garden Gym dip station is designed for physical exercise, specifically targeting upper body strength through dips and similar exercises. It consists of wooden posts and horizontal bars that users can grip for various bodyweight movements. The equipment is intended for adult use and is not designed as a climbing frame or play equipment for children. Its primary function is to provide a stable and durable outdoor fitness solution for strength training.

Usage Features

Installation Process: The installation process is broken down into several key steps, starting with preparation and layout, followed by digging holes, assembling the structure, and finally securing it with concrete.

  1. Pre-installation Check: Before starting, it is crucial to ensure that the first pull-up bar (if part of a larger Garden Gym setup) is solid, as the monkey bar connection can create movement in the foundations. It is recommended to allow the pull-up bar concrete to harden for 2-4 hours, depending on the mix used, before adding the monkey bar.
  2. General Guidance: The instructions are provided as a guide, and modifications may be necessary depending on ground conditions. Users are advised to consult a qualified professional or the Garden Gym Team if unsure. Installation should be carried out by two people. Before digging, it is essential to ensure no underground services like drains or electricity are present. The Garden Gym explicitly states it does not accept liability for incorrect or improper installation and subsequent use.
  3. Tools and Materials:
    • Tools: Spade / hole diggers, safety gloves, step ladder, tape measure, level, 2 x 19mm socket drivers, hammer.
    • Materials: Post mix (1-2 bags per post, depending on hole size and ground conditions).
  4. Layout the Bars: Use the two dip bars and smaller cross bars to determine the position of the holes. Ensure to account for the section of the bar that slides into the wooden post. All three holes should be dug at this stage.
  5. Digging the Holes: This is a critical step. Holes must be a minimum of 600mm deep (700mm for 3.6m posts). Ample space should be left for alignment and adjustment of posts.
  6. Assemble the First Bar: Unlike the pull-up bar, it is recommended to install all posts and bars and achieve a level setup before adding concrete. Begin with the bar connected to the pull-up unit, inserting, aligning, and leveling it.
  7. Insert the Rest of the Posts and Bars: Take time to insert the remaining bars and posts. Bolts can be inserted but should not be tightened yet, allowing for movement and adjustment. Once everything is level, the bolts can be tightened.
  8. Concrete in Place: Once the structure is level and aligned, concrete can be added, ensuring everything remains in position. The holes can then be backfilled, nuts and bolts checked for tightness, and caps inserted into the holes.

Safety Guidelines (Train Safe!): A comprehensive list of safety precautions is provided to ensure safe usage:

  1. Medical Consultation: Always consult a doctor before undertaking any physical exercise.
  2. Injury Prevention: Be aware that injuries may result from excessive, incorrect training, or using the equipment improperly.
  3. Personal Items: Remove jewelry, watches, or anything that might catch or snag before exercising.
  4. Warm-up: Always warm up prior to exercising. If unsure, consult a health professional.
  5. Child Supervision: Children should not use the equipment without strict adult supervision. Adults must be aware of how to exercise correctly.
  6. Intended Use: The products are designed for exercise, not as climbing frames or play equipment. Users are solely responsible for any accidents or injuries from usage, regardless of proper or improper use.
  7. Liability Disclaimer: The Garden Gym Ltd disclaims all liability for misuse or incorrect installation.
  8. No Modifications: Users must not adapt, amend, or remove any part of the equipment.

Maintenance Features

Foundations: The stability of the gym relies heavily on correct post installation. A minimum depth of 600mm is recommended. The concrete must be fully hardened before use (2-3 days). The hole's suitability depends on ground conditions and planned usage. A small amount of pea shingle at the base of the post is recommended to aid drainage.

Maintenance: The materials used are maintenance-free. The posts have a tanalised finish, providing a 10-year life expectancy. A crucial maintenance task is to check the bolts and fixings monthly and tighten them as necessary. This is important because timber can undergo a natural drying process, which may cause fixings to loosen over time. Regular checks ensure the equipment remains secure and safe for use.

The Garden Gym Dip station Specifications

General IconGeneral
MaterialSteel
ColorBlack
Assembly RequiredYes
CoatingPowder Coated
Weight Capacity150 kg