EasyManua.ls Logo

The Garden Gym Dip station User Manual

Default Icon
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
General guidance
These instructions are provided as a guide to help you
install your equipment. Depending on the type of ground
conditions it may be necessary to modify the installation.
If you are unsure, please consult a qualified professional or
contact the Garden Gym Team. The installation should be
carried out by 2 people. Before digging you must ensure
that there is no risk of encountering services such as
drains or electricity.
The Garden Gym does not accept any liability in relation
to the installation and subsequent use of the gym
relating to incorrect or improper installation.
You will need
Spade / hole diggers / safety gloves / step ladder / tape /
measure / level / 2 x 19mm socket drivers / hammer
Post mix
Between 1 and 2 bags per post, depending on
the size of your holes and ground conditions
Dip station
Installation guide
NB- Before you start!
Ensure that the first pull up bar is solid. You will connect the
monkey bar to the original pull up bar which will can create
movement in the foundations. We recommend that you let the
pull up bar concrete harden before starting to add the monkey
bar. Depending on the mix you used this would be between 2-4
hours.
Question and Answer IconNeed help?

Do you have a question about the The Garden Gym Dip station and is the answer not in the manual?

The Garden Gym Dip station Specifications

General IconGeneral
MaterialSteel
ColorBlack
Assembly RequiredYes
CoatingPowder Coated
Weight Capacity150 kg

Summary

Before You Start

General Guidance

Instructions for installation, emphasizing ground conditions and professional consultation. Covers liability.

Installation Steps

Layout the bars

Positioning the dip bars and cross bars to mark out hole locations for post installation.

Digging the holes

Digging post holes to a minimum depth of 600mm, allowing space for alignment and adjustment.

Assemble the first bar

Installing posts and bars, starting with the pull-up unit connection before concrete.

Insert the rest of the posts and bars

Inserting remaining posts and bars, loosely bolting them to allow for leveling before final tightening.

Concrete in place

Adding concrete once alignment is confirmed, backfilling holes, and checking fixings.

Important Considerations

Foundations

Ensuring post stability with a minimum depth of 600mm and proper drainage at the base.

Maintenance

Checking bolts and fixings monthly for tightness due to timber drying.

Train Safe!

Safety guidelines including medical consultation, proper usage, warm-ups, and supervision.