EasyManua.ls Logo

THERMEx THW20 - Page 50

THERMEx THW20
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Heat Pump Manual
50
COMMISSIONING
Tandem Installation Checks
On the master heat pump set
the cycle time to 10 minute test
and after 10 minutes check that
the heat pumps duty cycle.
Fault the running heat pump and
check the other heat pump
starts and vis-a-versa
Finishing Off
Is the electrical box closed and
door secure
Are all panels secure
If the mesh was removed from
the side of the heat pump has it
been replaced
Are all tools and debris clear of
the site
Are there any site specific feature
that may hinder the operation of
the heat pump in the future
Notes