EN-13
Figure 15(Sketch map of drain construction)
1. O
pen the drain switch to release the water from the cavity into the dr
ip
t
ray. Ensure the drip tray fit into the notch to avoid water overflow. The
drip tray can load 450mL water
.
2. A
fter all the water drain out, close the drain switch and put 800mL fresh
water into the cavity.
Drip tray
Water flow into drip tray from this
Open the drain switch, water
drainpipe from this end
Move the drain switch
start to drain water