T/QEK
AIKCKAff
AG-5B
SERIES
N.UUNTENANCE~AL
Table S-03
INSPECTION PROCEDURE
GUIDELINE
TIQEK
~IKtKAfT
MODEL
AG-SB
ANNUAL
OR
100-
HOUR
INSPECTION
PROCEDURE
ANNUAL
OR
100-
HOUR
INSPECTION
PROCEDURE
GUIDELINE
FAR
43.15
(c)
(1)
states: "Each person performing
an
annual or 100- hour inspection shall
use
a check list
while
performing
the
inspection. The check list
may
be
of
the
person's
own
design,
one
provided
by
the
manufacturer
of
the
equipment being inspected, or
one
obtained
from
an-
other source.
This
check list must include
the
scope
and
detail
of
the
items contained in
appen-
dix
D
to
this
part
and
paragraph (b)
of
this
section."
The
following
pages contain a comprehen-
sive
annual or
100
- hour inspection procedure check
list.
OWNER'S
NAME
STREET
ADDRESS
CITY
STATE
ZIP
CODE
REGISTRATION
NO.
SERIAL
NO.
AIRFRAME
HOURS
DATE
INSPECTION
COMPLETED
SERVICING
AGENCY
CITY
REPAIR
STATION
No.
(if
applicable)
Check
for
conformity with FAA Specifications, Airworthiness
Directives
and
Tiger Aircraft Service Bulletins
and
Letters.
NOTE
It
is
recommended that reference
be
made
to
the
applicable
maintenance handbook, service bulletins, letters, installation
instructions,
and
vendor specifications
for
torque values,
clearances, settings, tolerances
and
other specification
data.
STATE
Chapter 5
Page
5-11
Rev.
08/08/05