Step 8:
FELT THE ROOF - MEASURE AND CUT BEFORE INSTALLING FELT
• Rollfeltoutontoacleanatsurface30minutesbeforeyouneeditsoithasachancetoaenout.
• Measurelengthofroofandallow75mmoverhangateachend.Cuteachstripoffelttosize.
Useastraightedgetoguidecung.
• Rollcutfeltpiecealonglowsideofroof,Secon1,leavingsucientoverhangtofolddownontoroofedge.
Donotfoldunderneathroof.
(Detail G1 & G2)
• Oncefeltisrolledout,xtoroofusingCN20bothends,makingsurefeltisstraight.Securethroughskirng
usingCN20atapprox.100mmintervals.
(Detail G2)
Ensurethefeltisght,securethetopsideoffeltusingCN20atapprox.100mmintervals.(Detail G3)
• Repeatforremainingfelt,workingfromthelowsideofrooftothehighside,overlappingthefeltby75mm
unltheroofisfullycovered.
(Detail G3)
• Foldtheoverhangingfeltatendsunderroofboardandtackinplace.
G1 G2 G3
INCORRECT FELT CORRECT FELT
CN20
CN20
CN20
ROOF BOARD
SECTION 1