TIGER SUMATRAN SHELTER GENERAL INSTRUCTIONS
10
gersheds.com 0113 205 4189 sales@gersheds.com
E1 E2 E3
N65
N65
N65
Step 6:
INSTALL ROOF BOARDS
• Beforeinstallingtheroofboards,checkthatthecabinissquarebothvercally&horizontally.
Adjustifrequired.
• Posionatongue&grooveroofboardushwithpurlinatoneendofroof.
• Fixthroughapexpurlinusing2xN65perboard.
(Detail E1)
• Fixthroughoneaddionalpurlinusing2xN65perboard.(Detail E2)
• Fixthroughsidetoplogsusing2xN65perboard.(Detail E3)
• Connueworkingacrossroof,repeangthestepsabove.
• Thenalroofboardmayneedtrimmingtositushwithpurlinatend.
CRITICAL!: ALL ROOF BOARDS MUST HAVE 2X N65 PER FIXING POINT AS OUTLINED ABOVE.
Step 7:
INSTALL ROOF BATTEN AND SKIRTING
• Fixroofbaenontotheundersideofroofboardsonlowsideusing6xN40,evenlyspacedalonglength.
Finishwithapieceofskirng,aachedusing6xN40,evenlyspacedalonglength.
(Detail F1 & F2)
NOTE: ROOF BATTENS AND SKIRTING MAY COME IN MORE THAN 1 SECTION.
F2F1
N40