Pleaseretaininstruconsforfuturereference
09
Step 4:
INSTALL GABLE TOPS
• Placeontopoftheeavesheightlogs.
Step 5:
INSTALL PURLINS
• Posionthepurlinswiththeangledcutstotheboom.(Detail D1)
Ensurenotchesinpurlinslineupwithgabletops.
• Securethepurlinsintothegabletopsusing2xN65perpurlinpergabletop.
(Detail D2)
• Repeatforallpurlinandgabletopjoins.
STANDARD PURLIN
STANDARD PURLIN WITH EXTRA NOTCH(ES)
D1
D2
N65
N65
EAVES HEIGHT