MAINTENANCE
© 2020 Alamo Group Inc.
MAINTENANCE
Weedoo Sickle Bar Mower Maintenance Section 4-10
DAILY MAINTENANCE SCHEDULE
The following services should be performed daily or every 8 hours of service, following the detailed maintenance
instructions in the operator’s manual.
______ Pivot points: Inject grease until it appears at ends.
______ Hydraulic ttings: Check for leaks with paper or cardboard. Tightenttings or replace hoses immediately.
______ Knives: Inspect for missing or damaged knives, change (only complete sets) as needed.
______ Main Frame / Deck: Unless otherwise specied retorque bolts according to torque specications in this
section.
______ Hydraulic Fluid Level: Add, if required, per uid recommendations.
Service performed by:_____________________________ Date:____/____/____ Hour
Meter:__________
Maintenance Section
** This page may be copied and used as part of the daily maintenance routine.