Injection Molding Machine Chapter 3
V3.0
3-12
8 Pre-operation checkpoints
8.1 Check before power ON
★
Check 3-phase voltage.
★
Check machine grounding wire.
★
Check motor wire.
After the checkpoints mentioned above are confirmed
,
operation procedures shall be
:
A)Turn the power switch on the power control cabinet to the “ON” position.
B)Power for the main control cabinet shall be turned on in the same manner.
※
60E-250Emodel has only one control cabinet.
8.2 Check before motor starting
★
Check the hydraulic oil in the oil tank
★
Check the cooling water pipe for proper connection and water supply.
★
Check the hydraulic pipes for being tightened up without any damage.
After the checkpoints mentioned above are confirmed
,
operation procedures shall be:
A)Turn machine power on
,
TMC screen will appear.
Screen 2-1