EasyManua.ls Logo

TMC 30E - Page 38

Default Icon
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Injection Molding Machine Chapter 3
V3.0
3-12
8 Pre-operation checkpoints
8.1 Check before power ON
★
Check 3-phase voltage.
★
Check machine grounding wire.
★
Check motor wire.
After the checkpoints mentioned above are confirmed
,
operation procedures shall be
:
A)Turn the power switch on the power control cabinet to the “ON” position.
B)Power for the main control cabinet shall be turned on in the same manner.
※
60E-250Emodel has only one control cabinet.
8.2 Check before motor starting
★
Check the hydraulic oil in the oil tank
★
Check the cooling water pipe for proper connection and water supply.
★
Check the hydraulic pipes for being tightened up without any damage.
After the checkpoints mentioned above are confirmed
,
operation procedures shall be:
A)Turn machine power on
,
TMC screen will appear.
Screen 2-1