EasyManua.ls Logo

Toika Eeva ES - Page 6

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Slip the back beam onto the support blocks, the breast beam
on the front of the loom and the knee beam into the slots
about two feet into the loom from the front. Because these
beams are idencal, if one of them is ght you can swap them
around to nd the best t. You can also rub the dowels with a
bar of soap to help it slide in.
Breast beam
Back beam
Knee beam
Leveling the loom
In order for the control mechanism to funcon
properly, the loom must sit level on the oor.
Check this by placing a level on the top edge of
each side frame to check the back-to-front level.
Place the level on the one of the rails that hold
the control box to check for side-to-side level.
Use shims under the corners as necessary to cor-
rect any problems.
Assembling the Overhead Beater
2 side pieces
Beater boom - has
rubber bumpers
Beater cap
Top connector