EasyManua.ls Logo

Toper TKM-SX 5 - User Manual

Default Icon
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
GAS VERSIONS
TKM-SX 3
TKM-SX 5
TKM-SX 10
TKM-SX 15
TKM-SX 20
ELECTRIC VERSIONS
TKM-SX 3 E
TKM-SX 5 E
1

Questions and Answers

Summary

SHOP ROASTERS USER MANUAL

WARNING

General Safety Guidelines

Advises reading the manual, using authorized services, and cautions against improper maintenance.

COMPONENTS AND FEATURES OF THE MACHINE

BEFORE MACHINE SETUP: SAFETY INSTRUCTIONS

Pre-Setup Safety Guidelines

Emphasizes crucial safety precautions that must be followed before installing the machine.

TRANSPORT OF THE MACHINE

ELECTRICAL SAFETY

Electrical Installation and Operation Guidelines

Covers wiring, grounding, motor rotation, and fire safety for electrical systems.

GAS SAFETY

Gas Installation and Leakage Procedures

Outlines safe gas installation, leakage checks, and response to leaks.

MACHINE SETUP: INSTRUCTIONS

ELECTRICAL CONNECTION

Wiring and Power Requirements

Details electrical wiring, voltage options, and power connection requirements.

GAS CONNECTION

Gas Supply and Regulator Setup

Covers gas plumbing, regulator installation, and gas nozzle conversion.

FIRE SUPPRESSION SYSTEM

ASSEMBLING YOUR ROASTER: INSTRUCTIONS

Chaff Collector Assembly

Chaff Collector Assembly (Continuation)

ASSEMBLING YOUR ROASTER: CHIMNEYS & REQUIRED DISTANCES

INSTALLATION AREA

FINAL CONNECTIONS

ELECTRICAL CONNECTIONS

TYPICAL GAS TRAIN CONNECTION

START UP & MAINTENANCE

OPERATING INSTRUCTIONS OF ROASTER: DIGITAL FUNCTIONS

CONTROL PANELS DIGITAL

MACHINE OPERATION (GAS)

Gas Roaster Initial Setup Steps

Details initial steps like opening the gas valve and setting temperature.

MACHINE OPERATION (GAS) (Continuation)

Setting Roasting Temperatures and Starting Burner

Explains using digital thermostat controls and initiating the burner.

Roasting Process and Coffee Loading

Covers gas release, warm-up, and loading green coffee beans into the roaster.

Dumping Roasted Coffee and Cooling Process

Describes releasing roasted coffee and starting the cooling fan.

Cooling and Emptying Roasted Coffee

Details turning off the cooler fan, emptying coffee, and stopping the mixer.

OPERATING INSTRUCTIONS OF ROASTER: FOR TOUCH SCREEN CONTROL PANEL VERSION

OPERATING INSTRUCTIONS OF ROASTER: FOR TOUCH SCREEN CONTROL PANEL VERSION (Continuation)

COMPONENTS OF THE TOUCH SCREEN

INSTRUCTIONS FOR THE MACHINE WITH MANUAL CONTROL

MANUAL ROASTING WITH TOUCHSCREEN

Step-by-Step Manual Roasting Process

Describes the manual roasting process using the touchscreen interface.

MANUAL ROASTING WITH TOUCHSCREEN (Continuation)

Manual Roasting Process Monitoring

Displays screens showing temperature progression during manual roasting.

PROFILE ROASTING

Initiating Profile Roasting Process

Explains how to start profile roasting and initial setup requirements.

PROFILE ROASTING (Continuation)

Profile Roasting Screen Navigation

Details the interface for selecting and managing roasting profiles.

HOW TO USE THE PROFILE ROASTING SYTEM

Selecting and Configuring Roasting Profiles

Guides on entering data and setting up custom roasting profiles.

HOW TO USE THE PROFILE ROASTING SYTEM (CONT)

Starting and Monitoring Profile Roasting

Explains starting the profile roasting process and monitoring temperature changes.

Achieving Crack Temps and Completing Roast

Details reaching crack temperatures and ending the roasting process.

MAINTENANCE & POTECTIVE INSTRUCTIONS

TROUBLESHOOTING

Drum and Roasting Time Issues

Addresses common problems related to drum sounds, rotation, and roasting duration.

TROUBLESHOOTING (Continuation)

Black;Burn Spots, Drum;Mixer Rotation Issues

Covers issues like bean spotting, and non-rotating drum or mixer.

Motor Rotation, Coffee Color, and Maintenance Issues

Addresses motor rotation, coffee color variations, and maintenance-related problems.

Chaff Collector Fire, Cooling Time, and Burnt Coffee Issues

Covers chaff collector fires, slow cooling, and burnt coffee outputs.

IGNITION SYSTEM TROUBLESHOOTING

Troubleshooting Ignition System Failures

Offers a flowchart for diagnosing ignition system failures.

MAINTENANCE OF THE MACHINE

PERIODIC MAINTENANCE

CHECKING FOR GAS LEAKAGE

ADJUSTMENT OF THE DRUM

ADJUSTMENT OF THE DRUM (Continuation)

LUBRICATION OF FRONT AND REAR BEARINGS OF THE BROILER

LUBRICATION OF FRONT AND REAR BEARINGS OF THE BROILER (Continuation)

LUBRICATION OF THE REDUCTION GEARBOX FOR ELECTRIC MOTOR

IN CASE OF EMERGENCIES

Emergency Stop and Restart Procedures

Covers using emergency stop buttons and the restart mechanism.

ELEMENT CHANGE IN ELECTRIC ROASTERS

ELECTRICAL DIAGRAMS

220 V Gas Roaster Electrical Schematics

Shows wiring diagrams for 220V gas roasters.

ELECTRICAL DIAGRAMS (Continuation)

380 V Gas Roaster Electrical Schematics

Shows wiring diagrams for 380V gas roasters.

Electric Roaster Wiring Schematics (Part 1)

Presents electrical diagrams for electric roasters.

Electric Roaster Wiring Schematics (Part 2)

Continues the electrical diagrams for electric roasters.

CERTIFICATE OF WARRANTY

Toper TKM-SX 5 Specifications

General IconGeneral
BrandToper
ModelTKM-SX 5
CategoryKitchen Appliances
LanguageEnglish

Related product manuals