Drawing 10148 REV 0 24-11-15
Routine Maintenance of system (Cont)
Pool Audit and Pool Plant PPM
In addition to maintaining the dosing system it is essential that there is a planned audit procedure
and routine processes are carried out on the general swimming pool plant, with associated Risk and
Method Statements. If this is not completed and the pool plant not maintained is likely that the
dosing system will not be able to maintain safe water and the operators and users may be put at risk
of injury. These are sample documents and are intended to provide a guide to the operator.