EasyManua.ls Logo

TOPP S200 - Automatic Spring Load; Automatic Load Procedure Steps

TOPP S200
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
AUTOMATIC SPRING LOAD
instructions for installation
S200
1Automatic load procedure:
Simultaneously press
ENTER BUTTON - DOWN BUTTON
and “TURN ON”
the automation.
The display shows «REC»
2-Press and hold down
DOWN BUTTON
until the reference F is aligned with
the microswitch
(the plate will rotate clockwise: down-
load)
3-PRESS ENTER BUTTON
The display shows «ROT»
4-Load as indicated:
Press and hold down
DOWN BUTTON for 365 degree
(the plate will rotate clockwise: load)
5-Insert the screw at
the BOARD SIDE GLS
and tighten fully with an
T Allen key
6-Press ENTER
for ADJUSTAMENT
The display shows «END»
7-Insert the screw at
THE MOTOR SIDE (SMS)
and tighten fully with an
T Allen key
Press ENTER
The automation is now FULL
LOADED.Proceed installation
The display shows
TURN ON
Load
Hold down
Hold down
board side screw
motor side screw
Load
365°

Related product manuals