EasyManuals Logo

Trane Technologies EERVR100A1P00B User Manual

Trane Technologies EERVR100A1P00B
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information pack
upon completion of work.
HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
WARNING:
Installer’s Guide
General Information 1
Installation Limitations & Recommendations 1
Unit Installation 2
Installation on a concrete wall 2
Installation on a stud wall 3
Installation on floor joists 3
Installation on roof rafters 3
Duct Connections 6
Electrical Controls 8
Percent Timer Control 8
Push Button Point-of-use Control 9
Checkout Procedure 10
Contents
A. GENERAL INFORMATION
WARNING
!
THIS INFORMATION IS FOR USE BY INDIVIDUALS
HAVING ADEQUATE BACKGROUNDS OF ELECTRICAL
AND MECHANI CAL EXPERIENCE. ANY ATTEMPT TO
REPAIR A CENTRAL AIR CONDITIONING PRODUCT IN-
CLUDING AN ERV MAY RESULT IN PERSONAL INJURY
AND/OR PROPERTY DAMAGE. THE MANUFACTURER
OR SELLER CANNOT BE RESPONSIBLE FOR THE
INTERPRETATION OF THIS INFORMATION, NOR CAN
IT ASSUME ANY LIABILITY IN CONNECTION WITH ITS
USE.
CAUTION
!
To prevent shortening its service life, the ERV should
not be used during the nishing phases of construc-
tion. Compounds used in construction and construc-
tion dust may cause rapid deterioration of the cabi-
net and internal components. To avoid damage keep
drywall spray, construction dust, etc from entering the
air stream of the unit.
These instructions do not cover all variations in systems
or provide for every possible contingency. Should further
information be desired or particular problems arise which
are not covered sufficiently by this manual, contact your
local distributor or the manufacturer as listed on the ERV
nameplate.
BEFORE YOU BEGIN THE INSTALLATION
Check carefully for any shipping damage. This must be
reported to and claims made against the transportation
company immediately. Open carton, remove packing mate-
rial, loose parts and ship-with literature. Check to be sure
all major components are in the unit. Any missing parts
should be reported to your supplier at once, and replaced
with authorized parts only.
18-HE58D1-7
Energy Recovery Ventilator (ERV)
EERVR100A1P00B
EERVR200A1P00B
EERVR300A1P00B
Figure 1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Technologies EERVR100A1P00B and is the answer not in the manual?

Trane Technologies EERVR100A1P00B Specifications

General IconGeneral
BrandTrane Technologies
ModelEERVR100A1P00B
CategoryFan
LanguageEnglish

Related product manuals