Fig.19
Fig.20
Fig.21
(4)
(4)
(4)
(4)
(16)
(17)
(4)
(4)
(24b)
(25b)
(24b)
(25b)
(16)
(17)
(24a)
(25a)
(24a)
(25a)
19. Insert Small Polycarbonate Sheet (24a/25a) into slot of Top Bar. Adjust position of Small
Polycarbonate Sheet (24a/25a). Insert #2 Left Support Tube (16) and #2 Right Support Tube (17)
into the lower slot on Top Bar. Adjust position and ensure that they are vertical and parallel. Then,
insert Large Polycarbonate Sheet (24b/25b) into slot of top Bar, and adjust position of Large
Polycarbonate Sheet (24b/25b). Repeat on each side. See Fig.19 to Fig.21
15