EasyManua.ls Logo

UMS KSAT - Page 6

UMS KSAT
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Measuring with falling head technique
Fill burette with up to 5 cm (2 in)
water column.
Start measuring mode „Falling Head“
in the software.
Open burette cock quickly.
Note: How long measuring with falling head and constant head takes
The ballpark duration is seconds to a few minutes for very conductive substrates
like sand (~1000 cm/d or 400 in/d), whereas measuring substrates like unstructured clay
with very low conductivity (< 0,1 cm/d or 0,05 in/d) may take about 24 hrs or longer.
The typical exponential curve shape.
6 | Measuring
Measurement runs automatically.
0
5
The typical exponential curve shape.

Related product manuals