EasyManua.ls Logo

UNIA MX - Page 23

UNIA MX
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
3.1. Fertiliser distribution rate control
Fertiliser distribution rate = quantity of caught fertiliser [kg] x factor [kg/ha].
3.1.1. By travelling the measurement distance
Working width [m]
Measurement distance [m]
Area over which the fertiliser
has been distributed
[ha]
Factor
9.00
10.00
55.50
50.00
1/40
1/40
40
40
12.00
41.60
1/40
40
15.00
33.30
1/40
40
16.00
18.00
31.25
27.75
1/40
1/40
40
40
20.00
25.00
1/40
40
21.00
23.80
1/40
40
24.00
41.60
1/20
20
27.00
37.00
1/20
20
28.00
35.70
1/20
20
30.00
32.00
36.00
33.30
31.25
27.75
1/20
1/20
1/20
20
20
20
Calculation of the measurement distance for working widths not included in the
table. Working width up to 23 [m] factor = 40
Measurement distance
for a given work. width =
500
working width [m]
Working width above 24 [m] factor = 20
Measurement distance
for a given work. width =
3.1.2. By taking measurement at a halt
1,000
working width [m]
Working width
[m]
Measurement
distance [m]
Factor
Time of opening [s] of the process
hole at the assumed working speeds
[km/h]
8
10
12
9.00
55.50
40.00
24.97
19.98
16.65
10.00
50.00
40.00
22.50
18.00
15.00
12.00
41.60
40.00
18.72
14.98
12.48
15.00
33.30
40.00
14.98
11.99
9.99
16.00
31.25
40.00
14.06
11.25
9.37
18.00
27.75
40.00
12.49
9.99
8.32
20.00
25.00
40.00
11.25
9.00
7.49
21.00
23.80
40.00
10.71
8.56
7.14
24.00
41.60
20.00
18.72
14.98
12.48
27.00
37.00
20.00
16.65
13.32
11.09
28.00
35.70
20.00
16.06
12.85
10.71
30.00
33.30
20.00
14.98
11.99
9.99
32.00
31.25
20.00
14.06
11.25
9.37
36.00
27.75
20.00
12.49
9.99
8.32

Related product manuals