EasyManua.ls Logo

Urbini Cubi - Bassinet Installation Steps; Attach Clips to Rails; Insert Metal Tubes

Urbini Cubi
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Before installing, remove the
mattress pad from the bottom of
play yard, place bassinet inside the
play yard and attach 16 clips to the
top rail.
CHECK to make sure all 16 clips are
securely attached to the top rails.
Antes de instalarlo, sacar la
almohadilla del colchón de la parte
de abajo del corralito, poner el
moisés en el interior del corralito y
sujetar las 16 presillas al riel superior.
VERIFIQUE para tener la seguridad
de que las 16 presillas están
apretadamente sujetadas a los rieles
superiores.
1
2
Insert the metal tubes together in the
bottom of the play yard as shown.
MAKE SURE tubes are
connected before installing the
mattress pad.
Inserte los dos tubos de metal juntos
en el fondo del corralito como se
indica.
ASEGÚRESE de que los tubos de
metal estén conectados antes de
instalar la almohadilla del colchón.