Installation Guide
Roseberry Bath End Panel
Important Information
• Read the instructions carefully.
• Ensure product contents are complete.
• Check the product for any signs of damage and remove any protective film.
• It is recommended that a technically competent installer undertakes installation.
• It is the installer’s responsibility to carry out a thorough assessment of the wall type and use
appropriate fixings.
• Care should be taken when drilling to avoid any hidden wires or pipes.
Installation
Set the height of the bath to suit the height of the bath panel according to the instructions
supplied with the bath
Fit the end panel before installing the side panel
Ensure that when the brackets and bath panel are fitted, the panel sits 4mm
proud of the bath rim.
Secure one “L” bracket to the wall using suitable fixings. It
is recommended that the bracket is fitted 300mm vertically
from the underside of the bath.
Secure the second “L” bracket to the underside of the
wooden batten under the bath rim using the screws
provided.
Screw one of the black Keku clips to the opposite side
of the end panel to the wall. The matching Keku clip
should be screwed to the back of the front panel. Use
the diagram as a guide to how these are fitted.
Once fully installed, seal around the bath panel on all
joints using a good quality, sanitary-grade silicone sealant.
Care & Maintenance
Furniture should be regularly dusted with a soft cotton or micro-fibre cloth. For more thorough
cleaning, occasionally wipe your furniture with a soft cloth dampened with a mild detergent
solution. Surfaces should be thoroughly dried with a lint free cloth to prevent watermarks. Under
no circumstances should solvent cleaning agents, bleach or abrasive cleaning agents or cloths be
used. Glass or mirrored panels should be cleaned using a non-solvent based glass cleaner and a
soft cloth. Spills should be removed immediately using a clean cloth. All bathroom furniture will
deteriorate through prolonged periods of exposure to high levels of condensation so bathrooms
must be adequately ventilated using suitable extraction. Failure to ensure adequate ventilation
may invalidate your guarantee. If it required to use the touch-up paint, ensure that the surface is
dry and clean and free from dust or oils. The paint should be applied using a slightly damp
sponge. Carefully dap the paint onto the required area and leave it to dry. Multiple coats may be
required to build-up the paint to give the required finish.