6. When the balloon is suciently filled, in other words, the balloon just raises the gas
nozzle, close the gas valve. 
7. Before removing the balloon from the gas nozzle, tie the neck of the balloon tightly
above the balance nozzle with approximately 0.5 m (2 ft) bit of string. 
RS41-D User Guide M211952EN-C
18