EasyManua.ls Logo

Valley ICON LINK - Page 7

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
3. Then screw the antenna cable end onto the cell modem card as
shown in the photo below (gold screw connection)
4. Use the included zip-ties to secure the wires neatly to the existing
Valley wires as needed.
5. Attach the RED (+12v) and RED/BLACK (GND) wires to the
SRB relay board J7 in the Valley panel as shown below.