Do you have a question about the Valley UNDERMOUNT and is the answer not in the manual?
Product Type | Bathtub |
---|---|
Installation Type | Undermount |
Shape | Rectangular |
Overflow | Yes |
Color | White |
List of necessary tools and materials for bathtub installation.
Guidelines for preparing structure, plumbing, and ensuring floor support.
Instructions for ensuring the bathtub is properly leveled and supported.
Build the framing for the bathtub installation.
Connect the necessary rough plumbing for the bathtub.
Install the bathtub drain assembly.
Prepare the mortar bed on subfloors using plastic film.
Apply a layer of mortar cement, 1 to 2 inches deep, to the tub area.
Lift bathtub into place and adjust leveling feet for proper support.
Confirm bathtub is level and all supporting elements are secure.
Apply even weight to bath basin to ensure proper setting with mortar/adhesive.
Complete final drain connections and test for leaks.
Refer to specification sheets for countertop construction.
Apply sealant along the counter frame for a secure finish.
Apply weight until the silicone or adhesive sealant has fully set.
Apply continuous silicone sealant around bathtub rim and counter seam.