Do you have a question about the Varmebaronen EP 119 and is the answer not in the manual?
Key safety guidelines for installation and operation.
Covers alarm indication, external control, and heat pump integration.
Explanation of red, yellow, and green indicators and their meanings.
Describes the operation of STOP and OK buttons and display feedback.
Essential checks to perform before the boiler's first startup.
Step-by-step guide for powering on and starting the boiler for the first time.
Explanation of the heating curve graph and adjustable setpoints (P1-P11).
Configuration of load guard using secondary and direct measurement.
Covers maintenance, draining, safety valves, and frost protection measures.
Instructions for checking and setting temperature and pressure guards.
How indicators work and how to retrieve alarm details.
Details on red alarms (R1-R10), their causes, and remedies.
Additional causes and remedies for red indicator alarms (R11-R12).
Explanation of yellow warnings (Y1-Y4) and their triggers.
How the display shows which guard has been triggered.
Guidelines for addressing triggered guards and performing resets.
Description of how the load-break switch operates and is reset.
Instructions for resetting temperature and pressure guards.
Adherence to regulations, boiler placement, and room requirements.
Specifications for water quality and necessary flow rates for optimal performance.
Connecting the boiler to an expansion system via safety pipes.
Specifications for safety valves in closed and open systems.
Illustrations showing the connection of pressure guards.
Configuration for load guard measurement methods.
Overall schematic of the boiler's control circuit.
Guidance on identifying and fixing irregular operation and flow issues.
| Brand | Varmebaronen |
|---|---|
| Model | EP 119 |
| Category | Boiler |
| Language | English |