EasyManua.ls Logo

VBM DOMOBAR SUPER - MACHINE OPERATION; WATER SUPPLY PROCEDURE

VBM DOMOBAR SUPER
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
2
1
1
2
ENG
7,
OPERATION.
7.1,
WATER SUPPLY.
· Lift the cover (1), remove and fill the tank (2) with
softened cold water (2,5 litres) (or natural mineral
water).
· Replace the cover (1).
The lack of water in the tank (the
minimum level) inhibits the functioning of
the resistance and the water supply to the
coffee.

Table of Contents

Related product manuals