EasyManua.ls Logo

Vector Fog H100 - Page 3

Vector Fog H100
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
CHECKLIST BEFORE STARTING THE UNIT
Unpacking the unit
When unpacking the unit, please make sure that that the machine is not damaged and that all the accessories
mentioned in this manual are not missing.
Charge the battery
Make sure the right power supply is being used (110/220 volts). Connect the charger to the unit and then connect to
the mains. The machine requires around 8 to 10 hours to fully charge.
Inspect the ignition unit
Press the power button and listen to ensure that the spark plug is working to start the ignition process.
Fill the fuel tank
Fill the tank with undiluted petrol using a funnel. Do not overfill the tank. When you finish filling the tank, close the
tank cap tightly. The unit operates for approximately 40 minutes with a full tank.

Other manuals for Vector Fog H100

Related product manuals