EasyManua.ls Logo

VELECO FASTER - Page 51

VELECO FASTER
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection up to 3 months:
_____________________
Date, signature and stamp
Inspection up to 9 months:
______________________
Date, signature and stamp
Inspection up to 12 months:
______________________
Date, signature and stamp
Inspection up to 18 months:
______________________
Date, signature and stamp
Inspection up to 21 months:
______________________
Date, signature and stamp
10. Inspections Periodic inspection should be performed at the latest by 3/9/12/18/21 mon-
ths from the date of purchase.
veleco

Related product manuals