Do you have a question about the Ventura 60 and is the answer not in the manual?
Brand | Ventura |
---|---|
Model | 60 |
Category | Garbage Disposal |
Language | English |
List of required materials for the base assembly of the VENTURA 60 litre waste bin.
List of required materials for the base assembly of the VENTURA 110 litre waste bin.
Open the container, remove the securing rod and interior container.
Place the container at the desired location and mark out the bore pattern.
Drill holes for anchors based on the VENTURA model size (Ø 10mm for 60L, Ø 12mm for 110L).
Install fixed anchors, removing the upper nut and washer.
Adjust lower nuts to 25-30mm and level remaining nuts using a spirit level.
Put the container into position and screw it into place.
Insert the interior container and fix it using the securing rod.
Materials needed: strapping system and Allen key for post mounting VENTURA 60.
Materials needed: strapping system and Allen key for post mounting VENTURA 110.
Open container, remove securing rod and interior container.
Loosen the pipe mounting component.
Set the pipe mounting on the rod or candelabra to the desired height.
Mount the container and screw it into place.
Insert the interior container and fix it using the securing rod.
Materials: M8 attachment set, drill, spirit level, socket wrench for wall mounting VENTURA 60.
Materials: M10 attachment set, drill, spirit level, socket wrench for wall mounting VENTURA 110.
Open container, remove securing rod and interior container.
Mark out the bore pattern in accordance with the diagram.
Drill Ø 8mm holes for VENTURA 60 and Ø 10mm for VENTURA 110.
Set fixed anchors into the drilled holes.
Put the container into position and screw it into place.
Insert the interior container and fix it using the securing rod.