EasyManua.ls Logo

Venturo ET10KX - Page 27

Venturo ET10KX
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15660
C200
1-15-02E
8-2-06F
INSTALLATION - BATTERY CABLE
WINCH & CRANE
SUPERCEDES
TITLE
DATE
SECTION
CINCINNATI, OHIO
MANUFACTURING, INC.
Important: The crane must make connection with the negative of the battery. To insure this,
install a #2 gauge grounding strap from the engine to the truck frame (required if negative from
battery is connected to the engine.) Also, install a #2 gauge grounding strap from the crane
base to the truck frame, included with electric cranes.
Failure to accomplish the above mentioned steps may result in intermittent operation of
electric crane.
Master disconnect
switch necessary
for safety (locate
for easy access)
Engine to
truck frame
Attach cable to battery terminal
or starter solenoid ("hot" side)
Fuse or circuit breaker (P/N 19417) recommended.
Locate as close to starter or battery as is practical.
ET6KR
shown
Battery *
Power unit cable *
* Note: See Dwg 711105
for recommended battery
and cable specifications