EasyManua.ls Logo

Vertiv Liebert CRV CRC60 User Manual

Vertiv Liebert CRV CRC60
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Liebert® CRV CRC30 and CRC60
User Manual (Original Instructions)
30 kW and 60 kW, 50 Hz, Chilled Water Cooling System

Table of Contents

Questions and Answers:

Vertiv Liebert CRV CRC60 Specifications

General IconGeneral
BrandVertiv
ModelLiebert CRV CRC60
CategoryWater System
LanguageEnglish

Summary

Important Safety Instructions

Pre-installation Preparation

Moving the Packaged Unit

Details safe procedures for moving the packaged unit with a forklift.

Removing the Unit from the Pallet

Explains how to safely remove the unit from the shipping pallet.

Installing in Enclosure Row

Leveling the Unit

Details the procedure for leveling the unit correctly.

Combining the Unit with Adjacent Cabinets

Explains how to bay units together using brackets.

Piping Connections

Connecting Water Inlet and Outlet Pipes

Provides instructions for connecting water inlet/outlet pipes.

Releasing Pre-charged Nitrogen

Describes how to release pre-charged nitrogen from the unit.

Top Connection

Details connecting pipes through the top panel.

Bottom Connection

Details connecting pipes through the bottom panel.

Connecting Condensate Drainage Pipes

Explains how to connect condensate drainage pipes.

Top Connection

Describes connecting condensate drainage via the top.

Bottom Connection

Describes connecting condensate drainage via the bottom.

Electrical Connections

Connecting Power Supply Cable

Instructions for connecting the main power supply cable.

Connecting Power Supply Cable for CRC30

Specific steps for CRC30 power cable connection.

Connecting Power Supply Cable for CRC60

Specific steps for CRC60 power cable connection.

Connecting Communications Cables

Details for connecting various communication cables.

Start-up

Commissioning

Procedures for unit commissioning by authorized professionals.

Start-up

Steps involved in starting up the unit.

First Start-up (or After Long Standstill)

Detailed steps for initial or post-standstill start-up.

Maintenance

Maintenance Schedule

Provides a schedule for monthly, quarterly, biannual, and annual checks.

Troubleshooting

Lists common problems, causes, and corrective actions.

Related product manuals