2.Placepreparation
PortableSPA bathtubmayoperateinsideaswellasoutside. Theplacewherethebathtubistobe
installedshallmeetthefollowingconditions:
a) Appropriatespaceoftheroom(incaseofclosedrooms)
b) Appropriatesizeofthetransportroad,
c)Connectedvoltageof3~400Vandensuredefficiencyofelectricterminal,incaseofstandard
equipmentpowerconsumptionofthebathtubamountsto13,6kWandrequireselectriccableof
5x4mm ,
d)Waterterminal3/4”
e)Sewageterminal3/4”
f)Duetothedangerofporingwaterovertotheflooronwhichthebathtubislocatedthefloorshallbe
equippedwithfloordrainconnectedtothesewagesystemofthebuilding.Itisrecommendedto
constructaroundthebathtubadrainguttercoveredbygrateandconnectedtothesewagesystemof
thebuildingasdepictedinthedrawingbelow.(Incaseofclosedrooms).g)Stableandwellleveled
foundation. Thebathtubdoesnothavethepossibilityofleveling,
h) Appropriateventilation(incaseofclosedrooms).
2
I.Installation
Fig.Recommendedconstructionofdraingutter
withconnectiontothesewagesystemincaseofclosedrooms