3.Transportofabathtub.
It is recommended that the transport of bathtub be conducted in horizontal position in the original
packing of the producer on a wooden panel. It is possible to transport the bathtub in vertical position
after acrylic covers are removed. After taking from the pallet, the bathtub shall be transported by a
forklift. The base of the bathtub is adjusted to forklift transport. It is not allowed to handle cable and
other elements of massage system during transportation. It is not allowed t lean against bathtub
edges.
Placesadjustedtoforklifttransportation
4.Preparationofwater,sewerageandelectricalconnections.
Tofillupthebathusethe3/4”connectionshowedinthefigurebelow. Thebathrequiresapermanent
connectiontoawatersupplyasthisisindispensableforrefillinganylossesofwaterthatemergewhile
usingtheappliance.Ifthereisaconnectiontoawatersupplyrefillingthebathwithwatertakesplace
automatically.Waterlevelthatistoolowcausesthefiltrationsystem,andasaconsequencealsothe
water-heatingsystem,toshutdown.
Whileemptyingthebathmakesurethattheapplianceisconnectedtotheseweragesystem.
Fig.Placesofelectric,waterandsewageterminals
Electricterminalof13.6kW
3~400V
electriccableof5x4mm
2
Sewageterminal3/4”
The3/4”watersupplyconnection
Sewageterminal
backwash