2
Alarm relay
contacts
connection
2 Hardware installation
2.1 Package contents
The package in which the Blue Power Panel is delivered should contain
the following items:
• Blue Power Panel
• Manual
• Mounting instructions
• Four mounting screws
2.2 Installation instructions
1) Mount the Blue Power Panel
according to the included
mounting instructions.
2) Connect the Blue Power Panel
to the VE.Net network with a
standard straight UTP cable
with RJ45 connectors. An RJ45
splitter box may be used if necessary; however, the maximum total
cable length must not exceed 100 meters.
3) The Blue Power Panel is powered from the network. This means that
there must be at least one device on the network that is capable of
supplying power to other devices
1
.
4) If desired, an external alarm can be connected to the potential free
contact.
1
Devices capable of powering other VE.Net devices include the VE.Net Battery Controller, the VE.Net to VE.Bus
Converter and the VE.Net Generator Module.