EasyManuals Logo

Vivax ACP-12CH35AEF User Manual

Vivax ACP-12CH35AEF
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
20
Connect the charge hose with the push pin to the gas service port.
4. Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valves stem nuts and service port caps.
Use a torque wrench to tighten the service port cap.
Be sure to check for gas leakage.
6.6 Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
PDF 件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vivax ACP-12CH35AEF and is the answer not in the manual?

Vivax ACP-12CH35AEF Specifications

General IconGeneral
BrandVivax
ModelACP-12CH35AEF
CategoryAir Conditioner
LanguageEnglish

Related product manuals