VAS 581 009 unpacking instructions, placing into service, quick start guide
V2.00 05/18 All rights reserved.
Placing into service must be performed by qualified personnel under strict observance of
these instructions.
4.1 Installation location / stability
Make sure that the VAS 581 009:
is horizontal and stable
is located in a room with adequate ventilation and/or air exchange
is at least 10 cm away from other objects
is protected against rain, excessive humidity, direct sunlight and/or excessive dust
is not operated in explosive environments
Temperature equalisation
If the VAS 581 009 is delivered in winter, it must be ensured that no condensation can
occur inside the device. This is why we request that you leave the device standing
unplugged at the site of use for about three hours.