Operating instructions
80 Transporting the machine
1 Place the machine on level ground.
2 The engine must be turned off and the battery disconnect
switch turned off.
3 Lock the steering joint with the steering joint lock.
4 Install the lifting tool to front axle and the front bogie axle and
tighten the nuts crosswise to 200 Nm (148 lbf ft).
5 Connect four lifting slings to the lifting tools.
The four lifting slings must be of the same length and at
least 8.5 m (28 ft).
6 Lift the machine using the lifting eyes of the wheels.
7 Lower the machine.
8 Remove the steering frame lock before moving the machine.
9 Remove the lifting tool and store the associate nuts on the wire.
1031118
V1054697
V1054698
m
i
n
.
8
,
5
m
V1054702
Storing lifting tool