13
2. Assemble the bridge components following the steps below:
A. Attach two Bridge Supports to the Bridge Base. Connect two
Bridge Supports to the Mud Track. Attach the Small Track to the
Bridge Base.
B. Attach two Bridge Rails to the Bridge Floor, insert the Bridge
Floor into the SmartPoint
®
Bridge.
C. Connect the SmartPoint
®
Mountain to the Mud Track.