EasyManua.ls Logo

VTech Go Go Smart Wheels Train Station Playset - Storage Tower; Getting Started; Battery Installation - Train

VTech Go Go Smart Wheels Train Station Playset
15 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
STORAGE TOWER
1. Attach the storage tower
structure to its SmartPoint
TM
track. You will hear a ‘click’
sound to indicate the structure
is secure.
After the above steps, connect these pieces to the included track pieces.
You can congure them into different arrangements.
GETTING STARTED
BATTERY INSTALLATION - TRAIN
1. Make sure the unit is turned OFF.
2. Locate the battery cover on the bottom of the
unit. Use a screwdriver to loosen the screw.
3. Install 3 new AAA (AM-4/LR03) batteries
following the diagram inside the battery
box. (The use of new alkaline batteries is
recommended for maximum performance.)
4. Replace the battery cover and tighten the
screw to secure.
Getting Started

Related product manuals