EasyManuals Logo

VTech Toot-Toot Animals Parents' Guide

VTech Toot-Toot Animals
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
10
Connect all the parts
1. Locate the click hole below the SmartPoint™ big launching
platform and connect the left tree ramp with the mountain by
connecting the ramp into the click hole. You will hear a “click” to
indicate the piece is secure.
2. Use the Rhino spinning pool to connect the mountain base and
the tree house. You will hear a “click” to indicate the pieces are
secure.
3. Locate the click hole at the bottom of the tree house on the right
side and connect the right waterfall ramp. You will hear a “click” to
indicate the pieces are secure.
4. Attach the SmartPoint™ basket to the long zip line. Insert
the zip line into the left waterfall pillar and the small launching
platform. You will hear a “click” to indicate the pieces are secure.
1
4
4
2
3

Other manuals for VTech Toot-Toot Animals

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VTech Toot-Toot Animals and is the answer not in the manual?

VTech Toot-Toot Animals Specifications

General IconGeneral
BrandVTech
ModelToot-Toot Animals
CategoryToy
LanguageEnglish

Related product manuals