EasyManuals Logo

Wacker Neuson DV90 User Manual

Wacker Neuson DV90
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #105 background imageLoading...
Page #105 background image
BA D24 en/us* 1.0 * D24_1_0_400.fm 4-43
Putting into operation 4
Connections
1. Move vehicle Y close to machine X so that the length of the battery
jumper cables is sufficient.
2. Let the engine of vehicle Y run.
3. Unlock cover E and open.
4. Remove cover from positive terminal A.
5. Connect the battery jumper cables in the following order: A – B – C –
D.
6. Wait five minutes for the empty battery to be charged a little.
7. Start the engine of machine X.
8. Disconnect the battery jump cables in the following sequence: D-C-B-
A.
Fig. 94
E
_
+
Fig. 95 (symbolic representation)
Starting
battery
D
A
B C

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson DV90 and is the answer not in the manual?

Wacker Neuson DV90 Specifications

General IconGeneral
BrandWacker Neuson
ModelDV90
CategoryTrucks
LanguageEnglish

Related product manuals