BA D24 en/us* 1.0 * D24_1_0_400.fm 4-45
Putting into operation 4
Battery circuit breaker
NOTICE
Possible damage to the electronics due to improper actuation of the
battery master switch!
Do not operate the battery master switch with a running engine.
Operate the battery master switch no sooner than two minutes after
shutting down the engine.
Actuate the battery isolator switch:
If the vehicle is parked for longer periods of time (e.g. over the
weekend).
If the vehicle is to be protected against unintentional taking into
service.
If required by national and regional provisions.
Battery master switch is located behind the cover A on the left.
Fig. 97
A
1 2
Power supply Key position
Established 1
Interrupted 2 (key removed)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson DV90 and is the answer not in the manual?

Wacker Neuson DV90 Specifications

General IconGeneral
BrandWacker Neuson
ModelDV90
CategoryTrucks
LanguageEnglish

Related product manuals