EasyManua.ls Logo

Wacker Neuson ET35 - Page 162

Wacker Neuson ET35
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-52 BA E16 en* 1.0 * E16_10_510.fm
5 Operation
AUX V (option)
The change-over takes place on the left and right of the stick.
Stopping grab operation:
1. Move both levers D on the ball-type cock to position B.
Notch C indicates the flow direction.
Stopping bucket operation:
1. Move both levers D on the ball-type cock to position A.
Fig. 214
Fig. 215
B
D
C
Fig. 216
A
D

Table of Contents

Related product manuals