05 MAINTENANCE
PRELIMINARY INFORMATION
The maintenance operations must be done exclusively by a qualified personnel.
To facilitate the control, the machine is equipped with an hour counter placed on the dashboard,
which registers the functioning time and work.
Only with perfect maintenance can the machine be maintained in perfect condition allowing to
work well and in safety.
Always ensure, before working on the machine, that all the appropriate precautions have
been taken to guarantee that the person(s) carrying out the maintenance, repair, etc. may work in
total safety.
All cleaning operations must be carried out with the engine cold using, where possible, a jet of
pressurised water. Do not use solvents or similar substances to prevent damaging the guards,
gaskets, etc., and the paintwork.
Do not dispose of the oil and other liquids leaked during the maintenance operation inthe
environment. Collect it and send it to an authorised waste disposal.
It is advisable to equip an area dedicated to maintenance operations, protecting it from dripping
deriving from any drawing of hydraulic tubes, connections, joints.
All inspection and checking operations of the hydraulic system must be carried out with the oil at
operating temperature (around 60º C).