BLUPURAFizz80Manual Page19‐Revision:11‐2‐2018
PRE‐INSTALLATIONPROCEDURE
RequiredwitheachBLUPURAWaterTreatment
System.
1each–12inchlong
SupplyHose¼”ipsx3/8”Tube
1each–4inch¼”ODTubing
2each–3/8”Quick
ConnectConnector
1each– 3/8”x¼”quickConnect
1each–WaterShutoffValve
1each–CO
2
Regulator
3each–10’CoilsWaterTubing
Blue3/8”
3each–10’CoilsInsulationTubing
(notshown)
1each–10’C0
2
¼”ODTubing
(natural)
1each– ExternalFilter
1each– WaterPressureRegulator
1each–ExternalFilter
1each– Chiller