Do you have a question about the WILKINS 375XL and is the answer not in the manual?
Installer must ensure proper device selection and installation. Faulty installation can lead to improper function.
Outdoor installation requires protection against freezing conditions to prevent damage or malfunction.
Indoor installation is preferred for areas subject to freezing conditions.
Steps to follow after installation to place the Model 375 into operation, including pressurization and venting.
Tests the tightness of the #2 check valve against reverse flow under all pressure differentials.
Tests the tightness of the #1 check valve and records pressure drop across it.
Tests the operation of the differential relief valve to maintain a specific pressure zone.
Regular inspection and maintenance by licensed personnel are required annually or as per local codes.
Procedure for safely disassembling, inspecting, and reassembling check valves for maintenance.
Addresses sudden spitting issues, potential causes like inlet pressure drops, and corrective actions.
Details causes of light intermittent drips from the relief valve and corrective actions for the #1 check valve.
Covers causes of continuous relief valve discharge and diagnostic steps to identify faulty check valves.
Step-by-step guide to blow out the system for winter to prevent freezing damage.
Instructions for flushing the system during installation to remove debris before operation.
Details relief valve discharge rates and flow capacity through Schedule 40 Pipe for various sizes.
Installer must ensure proper device selection and installation. Faulty installation can lead to improper function.
Outdoor installation requires protection against freezing conditions to prevent damage or malfunction.
Indoor installation is preferred for areas subject to freezing conditions.
Steps to follow after installation to place the Model 375 into operation, including pressurization and venting.
Tests the tightness of the #2 check valve against reverse flow under all pressure differentials.
Tests the tightness of the #1 check valve and records pressure drop across it.
Tests the operation of the differential relief valve to maintain a specific pressure zone.
Regular inspection and maintenance by licensed personnel are required annually or as per local codes.
Procedure for safely disassembling, inspecting, and reassembling check valves for maintenance.
Addresses sudden spitting issues, potential causes like inlet pressure drops, and corrective actions.
Details causes of light intermittent drips from the relief valve and corrective actions for the #1 check valve.
Covers causes of continuous relief valve discharge and diagnostic steps to identify faulty check valves.
Step-by-step guide to blow out the system for winter to prevent freezing damage.
Instructions for flushing the system during installation to remove debris before operation.
Details relief valve discharge rates and flow capacity through Schedule 40 Pipe for various sizes.
| Brand | WILKINS |
|---|---|
| Model | 375XL |
| Category | Laboratory Equipment |
| Language | English |
Loading...