Do you have a question about the Wittmann Battenfeld VM 60 R1040 and is the answer not in the manual?
Details the manufacturer's liability and warranty conditions.
General safety regulations and legal compliance.
General information about safety devices and machine operation safety.
Safety regulations and procedures for installation and handling.
Safety precautions during operation and maintenance activities.
Safety guidelines for personnel involved with the machine.
Safety rules for hydraulic and pneumatic systems.
Safety guidelines for the optional Modular Airmould system.
Safety precautions when processing moulding compounds.
Safety rules for electrical installations and work.
Safety guidelines for nozzle, screw, and barrel replacement.
Safety instructions and methods for unloading the machine.
Information on handling and transporting the machine with monitoring systems.
Instructions for installing and leveling the machine.
Detailed instructions for leveling the machine using spirit levels.
Process of hydraulic oil preheating and temperature regulation.
Guidelines for electrical installation and safety.
Procedure for verifying hydraulic pump drive direction.
Preparatory steps before mounting a mould.
Step-by-step procedure for mounting a mould.
Procedure for clamping the mould to the clamping platen.
Description and operation of the quick-action mould mounting system.
Procedures for checking the functionality of safety devices.
Steps for performing a test run and interlock test.
Detailed description and diagram of the VM R clamping unit.
Detailed description and diagram of the VM clamping unit.
Design and function of the central lubrication pump.
Overview of the main components of the injection unit.
Procedure for adjusting the nozzle center.
Prerequisites for changing the nozzle.
Procedure for changing open nozzles.
Procedure for replacing Herzog needle shut-off nozzles.
Procedure for changing Fuchslocher needle valve nozzles.
Procedure for replacing Herzog needle valve nozzles.
Procedure for replacing Herzog bolt valve nozzles.
Procedure for replacing Herzog needle valve nozzles.
Procedure for replacing Fuchslocher needle valve nozzles.
Procedure for replacing ENG pneumatic needle valve nozzles.
Steps for dismantling the screw barrel and screw.
Procedure for dismantling screws up to size 1330.
Steps for dismantling the screw tip.
Step-by-step guide for initial machine start-up.
Procedure to restart the machine after an emergency stop.
Steps for performing a test run without material.
Instructions for filling the material hopper safely.
Procedure for performing a test run with material.
Step-by-step guide for safely shutting down the machine.
Steps for dismantling the mould.
Procedure for emptying the hydraulic system.
Steps for draining the cooling water supply.
Procedure for evacuating the compressed air system.
Safety procedures for disconnecting the electrical system.
Schedule of maintenance tasks based on operating hours.
Procedure and recommendations for changing hydraulic oil.
Procedure for changing the hydraulic filter element.
| Brand | Wittmann |
|---|---|
| Model | Battenfeld VM 60 R1040 |
| Category | Industrial Equipment |
| Language | English |